-
We report results from the first search for $\nu_\mu\to\nu_e$ transitions by
the NOvA experiment. In an exposure equivalent to $2.74\times10^{20}$
protons-on-target in the upgraded NuMI beam at Fermilab, we observe 6 events in
the Far Detector, compared to a background expectation of $0.99\pm0.11$ (syst.)
events based on the Near Detector measurement. A secondary analysis observes 11
events with a background of $1.07\pm0.14$ (syst.). The $3.3\sigma$ excess of
events observed in the primary analysis disfavors $0.1\pi < \delta_{CP} <
0.5\pi$ in the inverted mass hierarchy at the 90% C.L.
-
This paper reports the first measurement using the NOvA detectors of
$\nu_\mu$ disappearance in a $\nu_\mu$ beam. The analysis uses a 14
kton-equivalent exposure of $2.74 \times 10^{20}$ protons-on-target from the
Fermilab NuMI beam. Assuming the normal neutrino mass hierarchy, we measure
$\Delta m^{2}_{32}=(2.52^{+0.20}_{-0.18})\times 10^{-3}$ eV$^{2}$ and
$\sin^2\theta_{23}$ in the range 0.38-0.65, both at the 68% confidence level,
with two statistically-degenerate best fit points at $\sin^2\theta_{23} = $
0.43 and 0.60. Results for the inverted mass hierarchy are also presented.
-
The NO{\nu}A project will upgrade the existing Neutrino at Main Injector
(NuMI) project beamline at Fermilab to accommodate beam power of 700 kW. The
Medium Energy (ME) graphite target assembly is provided through an accord with
the State Research Center of Russia Institute for High Energy Physics (IHEP) at
Protvino, Russia. The effects of proton beam energy deposition within beamline
components are considered as thermal stability of the target carrier assembly
and alignment budget are critical operational issues. Results of finite element
thermal and structural analysis involving the target carrier assembly is
provided with detail regarding the target's beryllium windows.
-
The NO{\nu}A Experiment will construct a detector optimized for electron
neutrino detection in the existing Neutrino at Main Injector (NuMI) beamline.
This beamline is capable of operating at 400 kW of primary beam power and the
upgrade will allow up to 700 kW. The cavities will operate at 53 MHz and three
of them will be installed in the Recycler beamline. Thermal stability of the
cavities is crucial since this affects the tuning. Results of finite element
thermal and structural analysis involving the copper RF cavity will be
presented.