-
A new general purpose fixed target facility is proposed at the CERN SPS
accelerator which is aimed at exploring the domain of hidden particles and make
measurements with tau neutrinos. Hidden particles are predicted by a large
number of models beyond the Standard Model. The high intensity of the SPS
400~GeV beam allows probing a wide variety of models containing light
long-lived exotic particles with masses below ${\cal O}$(10)~GeV/c$^2$,
including very weakly interacting low-energy SUSY states. The experimental
programme of the proposed facility is capable of being extended in the future,
e.g. to include direct searches for Dark Matter and Lepton Flavour Violation.
-
Injection and beam dumping is considered for a 16.5 TeV hadron accelerator in
the current LHC tunnel, with an injection energy in the range 1 - 1.3 TeV. The
present systems are described and the possible upgrade scenarios investigated
for higher beam rigidity. In addition to the required equipment performance,
the machine protection related aspects are explored. The expected constraints
on the machine layout are also given. The technological challenges for the
different equipment subsystems are detailed, and areas where R&D is necessary
are highlighted.
-
An accelerator has limited dynamic range: a chain of accelerators is required
to reach high energy. A combination of septa and kicker magnets is frequently
used to inject and extract beam from each stage. The kicker magnets typically
produce rectangular field pulses with fast rise- and/or fall-times, however the
field strength is relatively low. To compensate for their relatively low field
strength, the kicker magnets are generally combined with electromagnetic septa.
The septa provide relatively strong field strength but are either DC or slow
pulsed. This paper discusses injection and extraction systems with particular
emphasis on the hardware required for the septa.