-
Hyper-Kamiokande will be a next generation underground water Cherenkov
detector with a total (fiducial) mass of 0.99 (0.56) million metric tons,
approximately 20 (25) times larger than that of Super-Kamiokande. One of the
main goals of Hyper-Kamiokande is the study of $CP$ asymmetry in the lepton
sector using accelerator neutrino and anti-neutrino beams.
In this paper, the physics potential of a long baseline neutrino experiment
using the Hyper-Kamiokande detector and a neutrino beam from the J-PARC proton
synchrotron is presented. The analysis uses the framework and systematic
uncertainties derived from the ongoing T2K experiment. With a total exposure of
7.5 MW $\times$ 10$^7$ sec integrated proton beam power (corresponding to
$1.56\times10^{22}$ protons on target with a 30 GeV proton beam) to a
$2.5$-degree off-axis neutrino beam, it is expected that the leptonic $CP$
phase $\delta_{CP}$ can be determined to better than 19 degrees for all
possible values of $\delta_{CP}$, and $CP$ violation can be established with a
statistical significance of more than $3\,\sigma$ ($5\,\sigma$) for $76\%$
($58\%$) of the $\delta_{CP}$ parameter space. Using both $\nu_e$ appearance
and $\nu_\mu$ disappearance data, the expected 1$\sigma$ uncertainty of
$\sin^2\theta_{23}$ is 0.015(0.006) for $\sin^2\theta_{23}=0.5(0.45)$.
-
Hyper-Kamiokande will be a next generation underground water Cherenkov
detector with a total (fiducial) mass of 0.99 (0.56) million metric tons,
approximately 20 (25) times larger than that of Super-Kamiokande. One of the
main goals of Hyper-Kamiokande is the study of $CP$ asymmetry in the lepton
sector using accelerator neutrino and anti-neutrino beams.
In this document, the physics potential of a long baseline neutrino
experiment using the Hyper-Kamiokande detector and a neutrino beam from the
J-PARC proton synchrotron is presented. The analysis has been updated from the
previous Letter of Intent [K. Abe et al., arXiv:1109.3262 [hep-ex]], based on
the experience gained from the ongoing T2K experiment. With a total exposure of
7.5 MW $\times$ 10$^7$ sec integrated proton beam power (corresponding to
$1.56\times10^{22}$ protons on target with a 30 GeV proton beam) to a
$2.5$-degree off-axis neutrino beam produced by the J-PARC proton synchrotron,
it is expected that the $CP$ phase $\delta_{CP}$ can be determined to better
than 19 degrees for all possible values of $\delta_{CP}$, and $CP$ violation
can be established with a statistical significance of more than $3\,\sigma$
($5\,\sigma$) for $76%$ ($58%$) of the $\delta_{CP}$ parameter space.
-
The nuSTORM facility has been designed to deliver beams of electron and muon
neutrinos from the decay of a stored muon beam with a central momentum of 3.8
GeV/c and a momentum spread of 10%. The facility is unique in that it will:
serve the future long- and short-baseline neutrino-oscillation programmes by
providing definitive measurements of electron-neutrino- and
muon-neutrino-nucleus cross sections with percent-level precision; allow
searches for sterile neutrinos of exquisite sensitivity to be carried out; and
constitute the essential first step in the incremental development of muon
accelerators as a powerful new technique for particle physics.
Of the world's proton-accelerator laboratories, only CERN and FNAL have the
infrastructure required to mount nuSTORM. Since no siting decision has yet been
taken, the purpose of this Expression of Interest (EoI) is to request the
resources required to: investigate in detail how nuSTORM could be implemented
at CERN; and develop options for decisive European contributions to the nuSTORM
facility and experimental programme wherever the facility is sited.
The EoI defines a two-year programme culminating in the delivery of a
Technical Design Report.